AI-assisted engineering
AI accelerates workload discovery, syntax conversion, dbt model scaffolding and documentation across recurring patterns.

Build around the people who know the work.
FOCUSED ENGINEERING GUIDE
A focused modernization path for schemas, SQL, stored logic and transformations, validated against the existing platform before migration.
Discuss your Snowflake migrationWHAT THIS ENGAGEMENT COVERS
Moving from Oracle or Teradata to Snowflake changes more than SQL syntax. Procedural logic, scheduling, utilities, data models and performance assumptions all influence how a workload should be redesigned on the target platform.
Ariftly begins with a dependency-aware assessment and groups the estate into migration waves. Repeatable conversions are accelerated, platform-specific exceptions are reviewed by engineers and target outputs are compared with the current system. The result is a Snowflake and dbt codebase accompanied by tests, lineage and a visible exception backlog.
THE PROBLEM
We start with the dependencies, exceptions and verification burden that make this work risky.
Platform-specific SQL and procedural logic
Schedulers, utilities and dependencies outside the SQL repository
Monolithic jobs that do not map cleanly to dbt
Performance assumptions tied to the legacy platform
Migration progress measured by files rather than verified behavior
EXPECTED INPUTS
DELIVERABLES
DELIVERY PATH
AI + DETERMINISTIC ENGINEERING
AI accelerates workload discovery, syntax conversion, dbt model scaffolding and documentation across recurring patterns.
Compilation, dbt tests, control totals, output comparisons and explicit exception review provide release evidence.
AI assists analysis, classification, mapping and transformation where it can reduce manual effort.
Your team receives code, mappings, tests, evidence and documented exceptions rather than a black box.
We work with the systems, controls and deployment boundaries that already run the business.
Material changes and unresolved exceptions remain subject to accountable engineering review.
REFERENCE SCENARIO
A generic migration wave and review package. It illustrates classification and control points without inventing customer volumes or outcomes.
ENGAGEMENT MODEL
One bounded workload, system or partner flow.
Implement, integrate and validate the agreed scope.
Monitor, support or extend where the operating need justifies it.
Turn proven repeated patterns into reusable engineering capability.
QUESTIONS
Yes, subject to assessment. Straightforward patterns can be converted systematically; procedural and utility-specific behavior may require redesign.
No. We choose boundaries based on maintainability, orchestration, performance and your target architecture rather than forcing all logic into one tool.
Dependencies, business criticality, workload complexity and validation readiness determine bounded migration waves.
That is the purpose of the reconciliation plan. We compare agreed outputs and document intentional or unresolved differences.
The engagement can include target-specific review, but performance goals and representative workloads must be defined explicitly in scope.
DISCUSS THE REAL PROJECT
Share a representative workload, specification or architecture. Sensitive production access is not needed for the first conversation.
Discuss your Snowflake migration